Feb 1, 2019 Update

The activity next week will remain similar the previous weeks. Excavation will continue 24 hours a day on the First Street site and we will continue preparing the foundation of the Mission Street site. Mitchell Engineering will continue Site Utility work for the Oceanwide Center development. The work includes the installation of single storm drain […]

Jan 23, 2019 Update

Mitchell Engineering will continue Site Utility work for the Oceanwide Center development starting next week. The work includes the installation of single storm drain lateral on First Street between Mission and Stevenson Streets. High impact noise is expected from 8:00PM to 12:00AM, followed by low impact noise from 12:00AM to 6:00AM. We are aware of […]

Jan 10, 2019 Update

Happy New Year! We have completed the excavation on the Mission Street site and are preparing the site for foundation work. We expect large concrete pours for our foundation to begin in March. Excavation on the First Street site is progressing and will continue over the next several months. We will continue to operate on site 24 […]

Feb 22, 2018 Update

Beginning this weekend and continuing next weekend, (2/24-2/25, 3/3-3/4), we will be installing overhead pedestrian and vehicular protection on Ecker between Jessie and Mission Street next to the work site. This will require the full closure of Ecker to vehicular traffic for both weekends from 7:00 am – 5:00 pm. Ecker will continue to remain […]

Feb 16, 2018 Update

The construction site will be closed down this weekend, including Monday, for Presidents’ Day. The installation of our deep foundation will continue to be a 24-hour a day operation as the type of foundation that is being installed requires that rebar and concrete be set immediately after these shafts are drilled down to bedrock. This […]

Feb 1, 2018 Update

The installation of our deep foundations will continue to be a 24-hour a day operation as the type of foundation that is being installed requires that rebar and concrete be set immediately after these shafts are drilled down to bedrock. This work will be most noticeable at various times over the next 6 weeks when […]

Jan 22, 2018 Update

Oceanwide’s contractors will continue drilled pile work at the 1st Street site. This will continue to be a 24 hour a day operation as the type of foundation that is being installed requires that rebar and concrete be set immediately after these shafts are drilled down to bedrock. We will continue our best efforts to limit the impacts of this work […]

Jan 8, 2018 Update

Oceanwide’s contractors will continue drilled pile work at the 1st Street site. This will continue to be a 24-hour-a-day operation as the type of foundation that is being installed requires that rebar and concrete be set immediately after these shafts are drilled down to bedrock. We will continue our best efforts to limit the impacts of this work on the neighborhood, […]

Dec 21, 2017 Update

Happy Holidays!  Oceanwide’s contractors will not be working the evening of December 23rd through the morning of December 26th and the evening of December 29th through the morning of January 2nd. Oceanwide’s contractors will continue drilled pile work at the 1st Street site. Unfortunately, this will continue to be a 24-hour-a-day operation as the type of […]

Nov 29, 2017 Update

Oceanwide’s contractors will continue installation of the perimeter shoring wall on the First Street site immediately east of 1 Ecker along Stevenson Street. This work requires large steel beams to be delivered to the site for the next several weeks.  The San Francisco Municipal Transit Agency (SFMTA) requires that all oversized deliveries occur between midnight […]