Entries by swinertonwebco

Nov 17, 2017 Update

The temporary overhead pedestrian safety protection will remain in place on the south side of Stevenson for the next week. Oceanwide’s contractors will continue installation of the perimeter shoring wall on the First Street site immediately east of 1 Ecker. This work requires large steel beams to be delivered to the site for the next […]

Oct 27, 2017 Update

The temporary overhead pedestrian safety protection has been installed on the south side of Stevenson. We expect that it will remain there for the next several weeks. Last week’s update noted that work would begin on the perimeter shoring wall this past Monday. Oceanwide had additional prep work to complete and this work did not […]

Oct 19, 2017 Update

Next week, Oceanwide’s contractors will begin installing the perimeter shoring wall on the First Street site immediately east of 1 Ecker. This work will require large steel beams to be delivered to the site for the next several weeks. The San Francisco Municipal Transit Agency (SFMTA) requires that all oversized deliveries occur between midnight and […]

Aug 28, 2017 Update

Oceanwide or its designated contractors will continue prep work for backfilling soil against the basement wall on the east side of One Ecker. The prep work protects the recently installed waterproofing and the structural integrity of the basement wall. Protection and backfilling will continue during daytime work hours for the rest of the month. We […]

July 14, 2017 Update

Continuing until late fall, Oceanwide’s contractors will be installing foundation piles for the Mission Street Tower. This work will require some additional night work. Unfortunately, this is a 24-hour-a-day operation as the type of foundation that is being installed requires that rebar and concrete be set immediately after these shafts are drilled down to bedrock. […]

July 7, 2017 Update

We hope you had a happy and safe 4th of July! Beginning in early July and continuing until late fall, Oceanwide’s contractors will be installing foundation piles for the Mission Street Tower. This work will require some additional night work. Unfortunately, this is a 24-hour-a-day operation as the type of foundation that we are installing […]

June 29, 2017 Update

Beginning in early July and continuing until late fall, Oceanwide’s contractors will be installing drilled foundation piles along the Mission Street site 24 hours a day. The foundation piles go all the way into bedrock, and the process of drilling and pouring concrete must be done in a 24-hour cycle and requires working at night. […]

June 26, 2017 Update

Oceanwide has completed Ecker Street pedestrian safety improvements. Ecker Street between Jessie and Mission is now open to southbound traffic. Both cars and pedestrians will have access to this portion of Ecker Street for the duration of construction. For safety, pedestrians should use the newly installed sidewalks when walking down Ecker Street. Beginning next week, […]

June 8, 2017 Update

On June 13 and 14, Ecker Street between Jessie and Mission Streets will be closed to install a vehicle safety barrier. This barrier will remain in place for the duration of construction. We will have flagging personnel at Anthony and Jessie Streets to assist with any delivery vehicles that need to access Jessie Street. Demolition […]

June 6, 2017 Update

NOTICE OF CONTINUED NIGHT WORK Beginning June 19 and continuing until late November, drilled pile work will be performed 24 hours a day as we begin the installation of the deep foundations on the Mission Street site. We apologize for any inconvenience caused by night work. Unfortunately, there is no way around this as our […]